All Forms

Construction & Development Permits

Building permits, electrical, mechanical, plumbing, demolition, ADU, and more.

62 forms62 available now

Apply Online

These forms are available to fill out and submit directly.

ADU Building Permit

Apply for an Accessory Dwelling Unit permit. ADUs are permanently exempt from SDCs.

PP&D·~60 days
Apply Now
Noise Code Variance

Apply for a variance to exceed Portland's noise limits (Title 18).

Noise Control·~10 days·$100–$200
Apply Now
Residential Building Permit

New construction, additions, and major alterations to residential structures.

PP&D·~90 days
Apply Now
Commercial Building Permit

New construction, additions, and alterations to commercial/mixed-use structures.

PP&D·~147 days
Apply Now
Electrical Permit

Residential and commercial electrical work. Often issued same-day via DevHub.

PP&D·~2 days
Apply Now
Mechanical Permit

HVAC, furnace, heat pump, ductwork, and gas piping installations.

PP&D·~2 days
Apply Now
Plumbing Permit

Plumbing fixtures, water heaters, sewer connections, and backflow preventers.

PP&D·~2 days
Apply Now
Demolition Permit

Demolish a residential or commercial structure. 35-day delay for residential.

PP&D·~21 days
Apply Now
Sign Permit

Install, replace, or modify commercial signage.

PP&D·~14 days
Apply Now
Tenant Improvement (TI)

Interior commercial build-out for a new tenant space.

PP&D·~35 days
Apply Now
Field Issuance Remodel (FIR)

Same-day permit for qualifying simple residential remodels.

PP&D·~1 days
Apply Now
Solar Panel Installation Permit

Permit for rooftop or ground-mounted solar PV systems.

PP&D·~14 days
Apply Now
Fence Permit

Required for fences over 6 feet (residential) or in required setback areas.

PP&D·~7 days
Apply Now
Retaining Wall Permit

Required for retaining walls over 4 feet in height.

PP&D·~30 days
Apply Now
Land Use Review Application

Adjustments, conditional uses, design review, zone changes, and land divisions.

PP&D Land Use Services·~60 days·$5,500–$25,000+
Apply Now
Tree Removal Permit

Remove or prune regulated trees on private property (Title 11).

Urban Forestry·~14 days
Apply Now
Erosion Control Permit

Required for ground-disturbing activity over 500 sq ft.

BES·~14 days
Apply Now
Fire Code Operational Permit

Permits for hazardous materials, assembly occupancies, and fire systems.

Portland Fire & Rescue·~14 days
Apply Now
Pre-Application Conference

Meet with PP&D staff before submitting a complex application.

PP&D·$5,000–$7,000
Apply Now
Site Development Permit

Grading, retaining walls, and site improvements.

PP&D Site Development·~45 days
Apply Now
Attic / Basement / Garage Conversion Permit

Convert an attic, basement, or garage into habitable living space.

PP&D·~14 days
Apply Now
Deck Permit

Build a new deck or modify an existing deck structure.

PP&D·~14 days
Apply Now
Stairs Construction Permit

Construct new interior or exterior stairs requiring a building permit.

PP&D·~10 days
Apply Now
Major Residential Alteration & Addition (MRAA)

Major additions, second-story additions, and substantial alterations to residential structures.

PP&D·~90 days
Apply Now
Storm Damage Emergency Repair

Expedited permit for emergency repairs due to wind, flood, fire, or storm damage.

PP&D·~3 days
Apply Now
Reroof Permit

Replace or repair roofing on residential or commercial buildings.

PP&D·~5 days
Apply Now
Change of Use / Change of Occupancy

Change the use or occupancy classification of an existing building.

PP&D·~30 days
Apply Now
Heritage Tree Permit

Work on designated Heritage Trees in Portland (Title 11).

Urban Forestry·~30 days
Apply Now
Tree Chemical Treatment Permit

Apply chemical treatments to regulated trees in Portland.

Urban Forestry·~14 days
Apply Now
Tree Attachment Permit

Attach structures, signs, or equipment to trees.

Urban Forestry·~14 days
Apply Now
Tree Pruning Permit (Private Property)

Prune regulated trees on private property (Title 11).

Urban Forestry·~10 days
Apply Now
Tree Pruning Permit (Street Trees)

Prune city-owned street trees in Portland's right-of-way.

Urban Forestry·~14 days
Apply Now
Tree Root Pruning Permit

Root pruning near regulated trees for sidewalk repair, utilities, or construction.

Urban Forestry·~14 days
Apply Now
Ornamental Lights for Street Trees

Install decorative or seasonal lights on city street trees.

Urban Forestry·~10 days
Apply Now
Urban Forestry Early Assistance

Pre-application consultation with Urban Forestry for development projects.

Urban Forestry·~21 days
Apply Now
Programmatic Tree Permit

Blanket Title 11 permit for eligible utilities and government agencies.

Urban Forestry·~120 days
Apply Now
Tree Permit Appeal

Appeal a tree permit, programmatic permit, or related Title 11 decision.

Urban Forestry·~45 days
Apply Now
Development Tree Plan

Submit a Title 11 tree plan for a related development permit.

PP&D / Urban Forestry·~30 days
Apply Now
Large Tree Removal Neighborhood Notice Certification

Certify required 45-day notice for development removal of 36-inch trees.

PP&D / Urban Forestry·~2 days
Apply Now
Replanting Waiver Application

Request waiver of replacement planting under Title 11.

Urban Forestry·~21 days
Apply Now
Ceremonial Bonfire Permit

Permit for ceremonial or recreational bonfires in Portland.

Portland Fire & Rescue·~14 days
Apply Now
Fire Art Performer Permit

Permit for fire art performances (poi, fire breathing, etc.).

Portland Fire & Rescue·~14 days
Apply Now
Public Assembly Fire Permit

Fire safety permit for public assemblies and special events.

Portland Fire & Rescue·~14 days
Apply Now
Outdoor Tent / Membrane Structure Permit

Permit for temporary tents and membrane structures over 400 sq ft.

Portland Fire & Rescue·~10 days
Apply Now
Laser Permit

Permit for laser equipment use in entertainment or commercial settings.

Portland Fire & Rescue·~14 days
Apply Now
Pyrotechnic / Special Effects Permit

Permit for pyrotechnics, fireworks, and theatrical special effects.

Portland Fire & Rescue·~21 days
Apply Now
Fire Sprinkler System Permit

Install a new fire sprinkler system (wet, dry, deluge, or pre-action).

Portland Fire & Rescue·~14 days
Apply Now
Minor Sprinkler Modification (10 heads or fewer)

Add, relocate, or replace 10 or fewer fire sprinkler heads.

Portland Fire & Rescue·~7 days
Apply Now
Fire Alarm System Installation

Install a new fire alarm or detection system.

Portland Fire & Rescue·~14 days
Apply Now
Fire Alarm Alteration Affidavit

Minor modifications to an existing fire alarm system.

Portland Fire & Rescue·~7 days
Apply Now
Portable Propane Device Permit

Permit for portable propane heaters and devices in commercial settings.

Portland Fire & Rescue·~7 days
Apply Now
Occupant Load Posting

Establish posted occupant load for assembly spaces and venues.

Portland Fire & Rescue·~10 days
Apply Now
Fire Department Lockbox Permit

Install a fire department Knox Box for emergency building access.

Portland Fire & Rescue·~7 days
Apply Now
Welding / Hot Work Permit

Permit for welding, cutting, brazing, and other hot work operations.

Portland Fire & Rescue·~5 days
Apply Now
Permanent Sign Permit

Install a permanent commercial sign (wall, freestanding, projecting, or awning).

PP&D·~14 days
Apply Now
Fabric Awning Permit

Install a fabric awning over a storefront or sidewalk.

PP&D·~10 days
Apply Now
Portable Sign (A-Board) Registration

Register an A-board or portable sidewalk sign for your business.

PBOT·~7 days
Apply Now
Temporary Sign Permit

Permit for temporary banners, flags, and promotional signs.

PP&D·~5 days
Apply Now
New Septic System Permit

Install a new on-site septic system on your property.

BES·~45 days
Apply Now
Septic System Repair / Alteration Permit

Repair or alter an existing on-site septic system.

BES·~14 days
Apply Now
Commercial Electrical Permit

Electrical work for commercial, industrial, and institutional buildings.

PP&D·~7 days
Apply Now
Commercial Mechanical Permit

HVAC, kitchen hoods, boilers, and refrigeration for commercial buildings.

PP&D·~7 days
Apply Now